MONTREAL, March 31, 2026 (GLOBE NEWSWIRE) -- Aya Gold & Silver Inc. (TSX: AYA; OTCQX: AYASF) (“Aya” or the “Corporation”) today announced its financial and operational results for the fourth quarter and full year ended December 31, 2025. All amounts are in U.S. dollars unless otherwise noted.
Full Year and Q4 2025 Highlights
Financial Highlights
Operational Highlights
Development and Exploration
“2025 was a defining year for Aya, with record financial performance driven by strong execution at Zgounder and continued advancement at Boumadine,” said Benoit La Salle, President & CEO. “With Zgounder now operating at steady state, we are entering a phase of significant cash flow generation, further supported by a strong silver price environment. Cash flow underpinned by the newly extended mine plan, is driving meaningful cash accumulation and providing the financial flexibility to accelerate development at Boumadine. We thank our team, our local partners and communities for their continued support and commitment to Aya’s success.”
Financial Review
Revenues totaled $202M in 2025, up 417% YoY, driven by increased consolidated AgEq ounces sold, of 4.9 Moz, up 223%, and higher average net realized price of $41.61/oz up 60% YoY. In Q4-2025, revenue totaled $75.3M, up 39% QoQ, driven by higher net realized price of $58.39/oz AgEq, up 47%, and the contribution of ounces sold from the start of the Boumadine pyrite reclaim operation.
Net income for 2025 was $46M (diluted EPS of $0.32) including a gain and impairment recovery of $5.8M from the Mx2 Mining Inc. transaction. In Q4-2025, net income was $18M (diluted EPS of $0.12). This compares to 2024 full-year net loss of $26M (diluted loss per share of $0.17)(9) for the year and $30M (diluted loss per share of $0.20)(9) in Q4-2024, both primarily due to the Tijirit project write-down of $27M. Aya’s successful Zgounder ramp-up, strong operational performance, and higher average net realized prices all contributed to achieving profitability.
The Corporation generated $72M in cash flow from operating activities in 2025, and $34M from Q4-2025. In 2025, capital expenditures of $33M were invested to complete the Zgounder mine expansion and $42M on exploration and evaluation, mainly at Boumadine.
The quarter ended in a strong financial position, with $136.3 million in cash and cash equivalents and total debt of $112M.
Financial Highlights (in thousands of US$, except per share amounts)
Operational Review
2025 consolidated production reached 5.0 Moz AgEq, including 1.54 Moz AgEq in Q4-2025, of which 0.17 Moz came from Boumadine stockpile reclaim launched in the fourth quarter. Full-year cash costs(4) of $20.25/oz AgEq sold, reflect the ramp-up of Zgounder through the year and the addition of ounces from Boumadine in the final quarter.
Zgounder Silver Mine
In 2025, Zgounder produced a total of 4.83 Moz of silver, a significant increase from 2024, reflecting the expansion of mining and milling operations. Production increased steadily through the year, with cash costs(4) averaging $20.41/oz AgEq sold, benefiting from higher scale and plant efficiencies, while depreciation rose in line with expanded operations. During Q4 2025, Zgounder produced 1.37 Moz of silver, a 2% QoQ increase, reflecting the completion of ramp-up. Cash costs(4) in Q4 were $20.50/oz AgEq sold, slightly below $20.79/oz in Q3 2025. For reference, the cash cost(4) in Q4 2024 was $26.57/oz AgEq, or $21.51/oz on an adjusted basis excluding ramp-up costs; the 2024 figures for the full year and quarter are not directly comparable due to difference in production scale.
The mill processed 1.18 million tonnes (“Mt”) of ore (3,229 tpd) in 2025, up 228% YoY, at an average grade of 145 g/t Ag, supported by strong recoveries and process improvements allowing for steadier, higher-rate milling as the year progressed. Over the year, mining activities averaged 2,840 tpd(11) at an average grade of 139 g/t Ag, with 62% of production from open-pit operations, in line with the strategy announced in March 2025. As such, Aya’s latest mine plan targets a one-third underground / two-thirds open-pit split, expanding the open-pit operation while focusing underground mining on deeper levels. This approach aims to improve ore recovery and grade predictability. In addition, several initiatives were implemented in H2-2025 to maximize ore recovery and minimize external dilution.
In Q4-2025, the mill processed 349,242t of ore at an average grade of 134 g/t Ag, with throughput averaging 3,796 tpd, mill availability of 99%, and silver recovery of 91.2%. Mining activities averaged 4,187 tpd during the quarter, at an average grade of 130 g/t Ag. This exceeded milling capacity, marking a key milestone in the transition to steady-state operations, positioning the operation to sustain a processing target of approximately 3,650 tpd going forward. As a result, the stockpile increased by 24% QoQ to 194,521t, in line with the Corporation’s objective to build inventory ahead of 2026 throughput.
Operational Highlights
* Revenues / Silver Equivalent Sold Consolidated (oz)
2025 Development and Exploration
Zgounder
Boumadine
Environmental, Social and Governance
The Corporation continued to advance its sustainability and health and safety performance in 2025, with a focus on proactive risk management, contractor engagement, and training, totaling 21,240 hours. Total Recordable Injury Frequency Rate (“TRIFR”) improved to 11.24 in Q4-2025 from 19.56 in Q4-2024. In Q4‑2025, Aya continued to support local communities through education, health, and cultural programs, while continuing to implement its ESMS and working towards ISO 14001 certification. The Corporation did not report any significant environmental incidents for the three months ended on December 31, 2025.
2025 Guidance Review
Aya met its overall 2025 production guidance (5.0-5.3 Moz Ag), delivering 5.0 Moz AgEq, including 0.17 Moz AgEq from the Boumadine pyrite reclaim operation (not included in original guidance). The average processed grade of 145 g/t Ag was below guidance (170-200 g/t Ag), reflecting the ramp-up blend of open-pit, underground, and stockpiled ore, as well as higher-than-expected dilution. The technical report filed on December 16, 2025, includes an updated mine plan and updated Mineral Reserve and Resource Estimate, incorporating revised grade expectations based on extensive drilling, refined geological interpretation, and current mining practices. Metallurgical performance slightly above the upper end of the guided range (84-88%), with 88.4% silver recovery for the year, including a 91.8% average in the second half. These strong throughput and recovery levels partially offset the impact of lower grades on cash costs per AgEq oz, which averaged $20.41 at Zgounder ($20.25/oz AgEq on a consolidated basis), above guidance ($15.00-$17.50/oz). In 2025, total exploration and development expenditures across the Corporation’s projects reached approximately $41 million, exceeding the guidance range of $25-30 million, reflecting the extended scope of work at Boumadine.
2026 Operation Outlook
Building on the operational and exploration achievements of 2025, Aya expects 2026 to be a year of strong execution, focused on operations and advancing exploration and development initiatives. Based on the current mine plan and operating assumptions, the Corporation reiterates the following 2026 outlook as follows:
Looking ahead, management believes that the current industry landscape, together with expectations for a supportive silver price environment, is expected to support strong margins and operating cash flow, providing confidence in Aya’s strategy to pursue opportunities across its portfolio. Following a positive Preliminary Economic Assessment, Aya remains focused on executing the Boumadine feasibility-level study and associated technical programs to advance the project toward development. The PEA and Aya’s work to date, highlights Boumadine’s potential for meaningful scale with significant resource expansion upside. Supported by a strong balance sheet, Aya is well positioned to invest in its future through disciplined capital allocation and continued exploration investment, with a continued focus on delivering long-term value for all stakeholders.
Outlook Assumptions
Q4-2025 Conference Call Details
Aya will release its fourth-quarter and full-year 2025 results on Tuesday, March 31, 2026 before market opens. Management will host a conference call on the same day at 10 a.m. Eastern Time to discuss the Corporation’s financial and operational results.
Participants may join the conference call via webcast or by dialing-in as follows: https://edge.media-server.com/mmc/p/qs9262uf
Webcast link: Instructions for obtaining conference call dial-in numbers:
Qualified Person
The technical information contained in this press release has been reviewed and approved by David Lalonde, B. Sc, Vice-President of Exploration, and by Raphael Beaudoin, P. Eng, Vice-President, Operations, both of whom are each a “Qualified Person” as defined under National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”), for accuracy and compliance with NI 43-101.
The NI 43-101 technical reports referenced herein are available under the Corporation’s profile on SEDAR+ and on the Corporation’s website.
About Aya Gold & Silver Inc.
Aya Gold & Silver is a Canadian precious metals mining company anchored in Morocco and active across the full mining value chain. The Corporation has established an exploration track record through a systematic, technology-led, data-driven approach and is focused on expanding its resource base and land package along the Anti-Atlas fault — one of Africa’s most geologically rich, underexplored and mining-friendly regions.
Aya operates Zgounder, a rare, silver-only mine, producing silver doré from its new processing facility. Aya’s growth pipeline includes the Boumadine polymetallic project, where feasibility study work is underway. The project hosts a substantial mineral resource, an extensive mineralized footprint, and significant potential for further discovery.
Led by a proven team of mining professionals, Aya is guided by a vision of responsible mining and is committed to delivering sustainable value for shareholders, employees and host communities.
For additional information, please visit Aya’s website at www.ayagoldsilver.com.
Or contact
Forward-Looking Statements
This press release contains “forward-looking statements” or “forward looking information” within the meaning of applicable securities laws and other statements that are not historical facts. Forward-looking statements are included to provide information about management’s current expectations, estimates and projections regarding Aya’s future growth and business prospects (including the timing and development of deposits and the success of exploration activities) and other opportunities as of the date of this press release.
All statements, other than statements of historical fact included in this press release, regarding the Corporation’s strategy, future operations, technical assessments, prospects, plans and objectives of management are forward-looking statements that involve risks and uncertainties. Wherever possible, words such as “aim”, “anticipate”, “assume”, “believe”, “estimate”, “expect”, “goal”, “guidance”, “intend”, “objective”, “plan”, “potential”, “strategy”, “target”, and similar expressions or statements that certain actions, events or results “may”, “could”, “would”, “might”, “will”, or are “likely” to be taken, occur or be achieved, have been used to identify such forward-looking information. Forward-looking statements in this press release include, but are not limited to, statements with respect to: the Corporation’s 2026 guidance, processing targets and throughput; the Preliminary Economic Assessment for the Boumadine project (PEA) including without limitation, project economics, financial and operational parameters such as NPV, IRR, and life of mine (LOM); timeline for completion of the Boumadine feasibility study; the advancement toward development of the Boumadine project; the Zgounder mine plan targets, expected ore recovery, grade predictability, and external dilution; the Corporation’s strategy, objectives and projections with regards to Zgounder, including to grow resources and advance long-term development at Zgounder Near Mine and Regional, annual production levels, life of mine (LOM), and operating cost profile; the Boumadine asset development and expansion potential; the Corporation’s expected expansion of its Boumadine land position and advancement of new targets identified; the 2026 Corporation’s operation outlook, including the focus on operations, advancing exploration, development initiatives, total production, and planned capital and operational expenditures; the commodities price environment, including silver price; allocation of the Corporation’s capital; and the Corporation’s future operating results, economic performance, and objectives.
Forward-looking information is based upon certain assumptions and other important factors that, if untrue, could cause the actual results, performance or achievements of the Corporation to be materially different from future results, performance or achievements expressed or implied by such information or statements. There can be no assurance that such information or statements will prove to be accurate. Key assumptions upon which the Corporation’s forward-looking information is based include without limitation, assumptions regarding development and exploration activities; the timing, extent, duration and economic viability of such operations, including any mineral resources or reserves identified thereby; the accuracy and reliability of estimates, projections, forecasts, studies and assessments; the Corporation’s ability to meet or achieve estimates, projections and forecasts; the availability and cost of inputs; the price and market for outputs; foreign exchange rates; taxation levels; the timely receipt of necessary approvals or permits; the ability to meet current and future obligations; the ability to obtain timely financing on reasonable terms when required; the current and future social, economic and political conditions; and other assumptions and factors generally associated with the mining industry.
Readers are cautioned that the foregoing list is not exhaustive of all factors and assumptions which may have been used. Forward-looking statements are also subject to risks and uncertainties facing the Corporation’s business, any of which could have a material adverse effect on the Corporation’s business, financial condition, results of operations and growth prospects. Some of the risks the Corporation faces and the uncertainties that could cause actual results to differ materially from those expressed in the forward-looking statements include, among others: Aya’s ability to execute plans relating to its Zgounder Project and Boumadine Project, including the timing thereof; risks and hazards associated with the business of mineral exploration, development, and mining, including environmental hazards, potential unintended releases of contaminants, industrial accidents, unusual or unexpected geological or structural formations, pressures, cave-ins, and flooding; risks related to Aya’s operations in Morocco; the speculative nature of mineral exploration and development; diminishing quantities or grades of mineral reserves as properties are mined; the inability to determine, with certainty, the production of metals and cost estimates, or the prices to be received before mineral reserves or mineral resources are actually mined; inadequate or unreliable infrastructure (such as roads, bridges, power sources and water supplies); fluctuations in forward markets for silver and other commodities (such as natural gas, fuel oil and electricity); restrictions on mining in the jurisdictions in which Aya operates; change of laws and regulations governing our operation, exploration, and development activities, including international laws and legal norms, such as those relating to Indigenous peoples and human rights; the Corporation’s ability to mitigate the risks pertaining to fund repatriation; expectations with respect to any future pandemics on our operations, and assumptions related thereto; Aya’s ability to attract and retain qualified employees and contractors; Aya’s ability to obtain necessary permits and licenses; inherent risks associated with tailings facilities and heap leach operations, including failure or leakages; Aya’s growth strategy; Aya’s ability to obtain insurance; occupational health and safety risks; adverse publicity risks; third party risks; disruptions to Aya’s business operations; Aya’s reliance on technology and information systems; litigation risks; interest and exchange rates risks; tax risks; unforeseen expenses; public health crises; climate change; general economic conditions; commodity prices and exchange rate risks; gold and silver demand; volatility of share price; public company obligations; competition risk; policies and legislation; force majeure; climate risks; the effectiveness of our internal control over financial reporting; risks related to competition in the mining industry; changes in technology; asset impairment (or reversal) potential, being consistent with the Corporation’s current expectations; the inherent risks involved in exploration and development of mineral properties; and other risks described in the Corporation’s documents filed with Canadian securities regulatory authorities.
In addition, readers are directed to carefully review the detailed risk discussion in the Corporation’s Annual Information Form and Management’s Discussion & Analysis for the year ended December 31, 2025, filed on SEDAR+, which discussions are incorporated by reference in this press release, for a fuller understanding of the risks and uncertainties that affect the Corporation’s business and operations.
Although the Corporation believes its expectations are based upon reasonable assumptions and has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. As such, these risks are not exhaustive; however, they should be considered carefully. If any of these risks or uncertainties materialize, actual results may vary materially from those anticipated in the forward-looking statements found herein. Due to the risks, uncertainties, and assumptions inherent in forward-looking statements, readers should not place undue reliance on forward-looking statements.
Forward-looking statements contained herein are presented for the purpose of assisting investors in understanding the Corporation’s business plans, financial performance and condition and may not be appropriate for other purposes.
The forward-looking statements contained herein are made only as of the date hereof. The Corporation disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except to the extent required by applicable law. The Corporation qualifies all of its forward-looking statements by these cautionary statements.
Technical Reports
The complete NI 43-101 Technical Report pertaining to the Boumadine Project titled “Preliminary Economic Assessment for the Boumadine Polymetallic Project, Kingdom of Morocco” (the “PEA”) was filed on December 18, 2025, and is available on Aya’s website and on www.sedarplus.ca.
The complete NI 43-101 Technical Report pertaining to the Zgounder Project titled “Technical Report – Updated Mineral Resource and Mineral Reserves Estimate of the Zgounder Silver Mine Operation, Kingdom of Morocco” (the “Zgounder Technical Report”) was filed on December 16, 2025, and is available on Aya’s website and on www.sedarplus.ca.
Qualified Persons
The independent Qualified Persons for the PEA, as defined by NI 43-101, are:
The independent Qualified Persons for the Zgounder Technical Report, as defined by NI 43-101, are:
Notes to Investors Regarding the Use of Mineral Resources and Mineral Reserves
The mineral resources estimate for Zgounder is effective as of June 30, 2025, as disclosed in a technical report titled “Technical Report – Updated Mineral Resource and Mineral Reserves Estimate of the Zgounder Silver Mine Operation, Kingdom of Morocco” dated as of December 16, 2025, and filed on SEDAR+ as of such date. The mineral reserves estimate for the Zgounder Technical Report is effective as of September 30, 2025, as disclosed in the Zgounder Technical Report. The key assumptions, parameters and methods used to estimate the mineral resources and mineral reserves for Zgounder and the identification of known legal, political, environmental or other risks that could materially affect the potential development of the mineral resources and mineral reserves are described in such Zgounder Technical Report.
The PEA is based on the updated mineral resource estimate (“MRE”) for the Boumadine Project, effective as of February 24, 2025, disclosed in a technical report titled “Preliminary Economic Assessment for the Boumadine Polymetallic Project, Kingdom of Morocco” dated as of December 18, 2025, and filed on SEDAR+ as of such date. The key assumptions, parameters and methods used to estimate the MRE and the identification of known legal, political, environmental or other risks that could materially affect the potential development of the mineral resources are described in such PEA.
The PEA is preliminary in nature, and it includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and, as such, there is no certainty that the PEA results will be realized.
Mineral resources are not mineral reserves and do not have demonstrated economic viability. The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues. There is no certainty that mineral resources will be converted to mineral reserves.
Investors are cautioned not to assume that part or all of an inferred mineral resource exists, or is economically or legally mineable.
Additionally, where the Corporation discusses exploration and expansion potential, any potential quantity and grade is conceptual in nature and there has been insufficient exploration to define a mineral resource and it is uncertain if further exploration will result in the target being delineated as a mineral resource. Varying cut-off grades have been used depending on the mine, methods of extraction and type of ore contained in the reserves. Mineral resource metal grades and material densities have been estimated using industry-standard methods appropriate for each mineral project with support of various commercially available mining software packages. Additional details regarding mineral reserve and mineral resource estimation, classification, reporting parameters, key assumptions and associated risks for each of the Corporation’s mineral properties are provided in the respective NI 43-101 Technical Reports which are available at www.sedar.ca and the Corporation’s website at www.ayagoldsilver.com.
Numbers may not add or multiply accurately due to rounding.
Non-GAAP Measures
The following tables present certain non-GAAP measures, as discussed in our press release. Reconciliations to the most directly comparable GAAP measures are provided below.
The Corporation has included certain non-GAAP financial measures and non-GAAP ratios in this press release, including “Cash costs per silver equivalent ounce sold” (“AgEq ounce”), “Adjusted cash cost per silver equivalent ounce sold” (“AgEq ounce”), “Production cost per tonne”, and “Available liquidity”, to supplement its consolidated financial statements, which are prepared in accordance with IFRS. The terms IFRS and generally accepted accounting principles (“GAAP”) are used interchangeably throughout this document.
The Corporation believes that these measures, together with IFRS measures, provide investors with enhanced transparency and a better ability to evaluate the Corporation’s underlying operating performance and liquidity. Cash cost per silver equivalent ounce sold and Production cost per tonne are widely used in the mining industry as performance benchmarks. However, our non-GAAP measures do not have standardized meanings prescribed under IFRS and may not be comparable to similar measures reported by other companies. Accordingly, they should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS.
Silver Equivalent Ounces Sold (“AgEq”)
Silver equivalent ounces are calculated by converting gold production into silver ounces using relative metal prices for the applicable reporting year. AgEq ounces allow the Corporation to present consolidated production and cost metrics on a comparable basis, as its operations may produce more than one metal. Silver equivalent ounces sold has been introduced in fiscal 2025 due to pyrite concentrate sales at Boumadine.
AgEq ounces are provided for additional information purposes only.
Cash Costs per AgEq Ounce Sold and Production Cost per Tonne
Cash costs per AgEq ounce sold, Adjusted cash cost per AgEq ounce sold and production cost per tonne are non-GAAP measures used by management to monitor and evaluate operating performance at both the mine and consolidated levels, in conjunction with the most directly comparable IFRS measures where applicable.
These metrics are widely reported in the mining industry as benchmarks for cost performance. Management and investors use them to assess the Corporation’s cost structure and operating efficiency, to compare operating performance with industry peers, and to evaluate the performance of individual mining operations within the Corporation’s portfolio.
Where applicable, cost metrics are calculated in a manner consistent with the guidelines published by the World Gold Council (“WGC”).
Cash Costs per AgEq Ounce Sold and Adjusted Cash Cost per AgEq Ounce Sold
Cash costs per AgEq ounce sold are calculated by:
Cash costs per AgEq ounce sold are intended to reflect the cash expenditures directly associated with production during the year and are used by management to evaluate the Corporation’s operating efficiency and cost performance.
Adjusted cash cost per AqEq reflects cash cost per AqEq further adjusted to exclude ramp-up costs as explained below the table.
In H2-2024 additional operational costs for expansion preparations, mine ramp-up, health and safety activities, hiring of new staff, training and the two-month delay in the expansion of the Zgounder Mine. Underground mining costs also increased in the quarter as we used our mining contractor to increase the rate of stope development and catch up on bolting and screening. In aggregate these additional costs totaled approximately $3.1 million for the year ($1.7 million for Q4-2024). The additional costs represented $5.06 per oz sold in Q4-2024 and $2.09 per oz sold for fiscal 2024. Excluding these costs, the adjusted cash cost per silver ounce sold is $21.51 in Q4-2024 and $19.62 for fiscal 2024.
Production Cost per Tonne
Production cost per tonne is calculated by:
Production cost per tonne is used by management to assess processing efficiency, cost control relative to throughput levels, and overall operational performance.